subject
Physics, 15.12.2021 03:50 genyjoannerubiera

At a local restaurant, the amount of time that customers have to wait for their food is normally distributed with a mean of 36 minutes and a standard deviation of 5

minutes. If you visit that restaurant 27 times this year, what is the expected number

of times that you would expect to wait less than 45 minutes, to the nearest whole

number?

ansver
Answers: 2

Another question on Physics

question
Physics, 21.06.2019 19:20
Aferris wheel is a vertical, circular amusement ride with radius 9 m. riders sit on seats that swivel to remain horizontal. the ferris wheel rotates at a constant rate, going around once in 9 s. consider a rider whose mass is 56 kg. at the bottom of the ride, what is the perpendicular component of the rate of change of the rider's momentum? at the bottom of the ride, what is the vector force exerted by the seat on the rider?
Answers: 1
question
Physics, 21.06.2019 20:40
The metric unit of electrical power is the watt volt ampere ohm
Answers: 1
question
Physics, 22.06.2019 08:20
The bubba chump shrimp company processes and packages shrimp for sale to wholesale seafood distributors. the shrimp are transported to the main plant by trucks that carry 1,000 pounds (lb) of shrimp. once the continuous flow processing of the shrimp begins, no inventory is allowed in buffers due to spoilage and all of the shrimp must be processed within 12 hours to prevent spoilage. the processing begins at the sorter, where the trucks dump the shrimp onto a conveyor belt that feeds into the sorter, which can sort up to 500 lb per hour. the shrimp then proceed to the desheller, which can process shrimp at the rate of 400 lb per hour. however, after 3 hours and 45 minutes of processing, the desheller must be stopped for 15 minutes to clean out empty shrimp shells that have accumulated. the veins of the shrimp are then removed in the deveining area at a maximum rate of 360 lb per hour. the shrimp proceed to the washing area, where they are processed at 750 lb per hour. finally, the shrimp are packaged and frozen. what is the daily process capacity of the processing plant (excluding the packaging and freezing)?
Answers: 2
question
Physics, 22.06.2019 12:30
Consider a 1000 w iron whose base plate is made of 0.5 cm thick aluminum alloy 2024-t6 (ρ = 2770 kg/m3 and cp = 875 j/kg°c). the base plate has a surface area of 0.03 m2. initially, the iron is in thermal equilibrium with the ambient air at 22°c. assuming 90% of the heat generated in the resistance wires is transferred to the plate, determine the minimum time needed for the plate temperature to reach 200°c.
Answers: 1
You know the right answer?
At a local restaurant, the amount of time that customers have to wait for their food is normally d...
Questions
question
Mathematics, 16.07.2020 20:01
Questions on the website: 13722360