subject
Physics, 01.01.2022 15:10 gmac24

The crew of US submarines work on an 18-hour cycle rather than a 24-hour day. They divide into three ‘watches’, each working for 6 hours, with a meal break for the half hour immediately before and another for the half hour immediately after work. The watches change at 05:30, 11:30, 17:30 and 23:30 Universal Time, no matter where in the world they are. How much time for meal breaks does a member of the crew get in a 72-hour (3-day) period?

Group of answer choices

4 hours

4 1/2 hours

3 hours

It depends when the period starts

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 14:30
An aircraft performs a maneuver called an "aileron roll." during this maneuver, the plane turns like a screw as it maintains a straight flight path, which sets the wings in circular motion. if it takes it 35 s to complete the circle and the wingspan of the plane is 11 m, what is the acceleration of the wing tip
Answers: 2
question
Physics, 21.06.2019 22:50
Aplane takes off from an airport and flies to town a, located d1 = 215 km from the airport in the direction 20.0° north of east. the plane then flies to town b, located d2 = 230 km at 30.0° west of north from town a. use graphical methods to determine the distance and direction from town b to the airport. (enter the distance in km and the direction in degrees south of west.)
Answers: 2
question
Physics, 22.06.2019 16:30
Using gravity, an elephant can pull a mouse towards it from the ground. true or false explain why. will give brainliest if answered fast and the best explanation
Answers: 2
question
Physics, 22.06.2019 18:00
Air enters a gas turbine with two stages of compression and two stages of expansion at 100 kpa and 17°c. this system uses a regenerator as well as reheating and intercooling – the intercooler returns the air to the inlet temperature. the pressure ratio across each compressor is 4 ; 300 kj/kg of heat are added to the air in each combustion chamber; and the regenerator operates perfectly while increasing the temperature of the cold air by 20°c. determine the system’s thermal efficiency. assume isentropic operations for all compressor and the turbine stages and use constant specific heats at room temperature. (0.378)
Answers: 3
You know the right answer?
The crew of US submarines work on an 18-hour cycle rather than a 24-hour day. They divide into three...
Questions
question
Mathematics, 21.03.2020 05:26
question
Mathematics, 21.03.2020 05:26
question
History, 21.03.2020 05:26
Questions on the website: 13722359