subject
Physics, 06.07.2019 13:30 babas97

Ariver flowing steadily at a rate of 175 m3 /s is considered for hydroelectric power generation. it is determined that a dam can be built to collect water and release it from an elevation difference of 80 m to generate power. determine how much power can be generated from this river water after the dam is filled.

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 18:10
Awheelhas a radius of 4.8 m. howfar (path length) does a point on the circumference travel if thewheel is rotated through angles of 30°, 30 rad, and 30 rev,respectively?
Answers: 3
question
Physics, 22.06.2019 11:30
Considering only the earth's rotation, determine how much later the asteroid would have had to arrive to put the explosion above helsinki at longitude 25˚ e? this would have obliterated the city.
Answers: 1
question
Physics, 22.06.2019 17:00
Two conductors, a and b, are each in the shape of a tetrahedron. but of different sizes. they are charged in the following manner: 1. tetrahedron a is charged from an electrostatic generator to charge q. 2. tetrahedron a is briefly touched to tetrahedron b. 3. steps 1 and 2 are repeated until the charge on tetrahedron b reaches a maximum value. if the charge on tetrahedron b was q/4 after the first time it touched tetrahedron a. what is the final charge qbmax on tetrahedron b?
Answers: 2
question
Physics, 22.06.2019 19:30
Aspacecraft that renters the earth’s atmosphere drastically slows down. the amount of kinetic energy the spacecraft has as it reenters the earths atmosphere
Answers: 2
You know the right answer?
Ariver flowing steadily at a rate of 175 m3 /s is considered for hydroelectric power generation. it...
Questions
question
Mathematics, 24.06.2019 04:00
question
Mathematics, 24.06.2019 04:00
Questions on the website: 13722362