subject
Social Studies, 05.05.2020 04:06 Sruyle51230

The pipefitting subcontractor is required to lay pipe in a trench that is 10 ft deep and 3 ft wide with vertical walls and no sloping or other protection. The trench was dug by the excavator. The general contractor supervised the work but had no employees in the trench. The concrete subcontractor told the general contractor and excavator that the trench needed to be sloped or shored before their employees could work in the trench. During the OSHA inspection, OSHA observed the general contractor at the trench supervising the pipefitter in the trench. Which contractor(s) would receive a citation for an unsafe trench?
a. pipefitting only
b. pipefitting and excavator
c. pipefitting, excavator, and general contractor
d. pipefitting, excavator, general contractor, and concrete subcontractor

ansver
Answers: 2

Another question on Social Studies

question
Social Studies, 22.06.2019 18:00
17 points! ! (explain your answer)
Answers: 1
question
Social Studies, 22.06.2019 23:00
Which of the following statements concerning brazil since independence is not true? brazilians today can participate in politics through voting. brazil has been governed by dictators and elected officials. brazil became independent from portugal in 1822. brazil was the first country in the americas to end slavery.
Answers: 2
question
Social Studies, 23.06.2019 01:00
What is the phrase describes the paleo-indians of prehistoric arkansas
Answers: 1
question
Social Studies, 23.06.2019 01:00
True or false: the eastern roman empire lasted for 1,000 years longer than the western roman empire.
Answers: 1
You know the right answer?
The pipefitting subcontractor is required to lay pipe in a trench that is 10 ft deep and 3 ft wide w...
Questions
Questions on the website: 13722367