subject
Business, 15.07.2020 02:01 arizola757

Mercer Asbestos Removal Company removes potentially toxic asbestos insulation and related products from buildings. There has been a long-simmering dispute between the company’s estimator and the work supervisors. The on-site supervisors claim that the estimators do not adequately distinguish between routine work such as removal of asbestos insulation around heating pipes in older homes and nonroutine work such as removing asbestos-contaminated ceiling plaster in industrial buildings. The on-site supervisors believe that nonroutine work is far more expensive than routine work and should bear higher customer charges. The estimator sums up his position in this way: "My job is to measure the area to be cleared of asbestos. As directed by top management, I simply multiply the square footage by $2.50 to determine the bid price. Since our average cost is only $2.175 per square foot, that leaves enough cushion to take care of the additional costs of nonroutine work that shows up. Besides, it is difficult to know what is routine or not routine until you actually start tearing things apart." To shed light on this controversy, the company initiated an activity-based costing study of all of its costs. Data from the activity-based costing system follow: Activity Cost Pool Activity Measure Total Activity Removing asbestos Thousands of square feet 800, thousand square feet, Estimating and job setup, Number of jobs 500 jobs, Working on non-routine jobs, Number of non-routine jobs 100. Other (costs of idle capacity and organization-sustaining costs) None. Note: The 100 non-routine jobs are included in the total of 500 jobs. Both non-routine jobs and routine jobs require estimating and setup. Costs for the Year Wages and salaries $300,000, Disposal fees 700,000, Equipment depreciation 90,000, On-site supplies 50,000, Office expenses 200,000, Licensing and insurance 400,000, Total cost $1,740,000. Distribution of Resource Consumption Across Activities Removing Asbestos Estimating and Job Setup Working on Nonroutine Jobs Other Total Wages and salaries 50 % 10 % 30 % 10 % 100 % Disposal fees 60 % 0 % 40 % 0 % 100 % Equipment depreciation 40 % 5 % 20 % 35 % 100 % On-site supplies 60 % 30 % 10 % 0 % 100 % Office expenses 10 % 35 % 25 % 30 % 100 % Licensing and insurance 30 % 0 % 50 % 20 % 100 % Required: 1. Perform the first-stage allocation of costs to the activity cost pools. 2. Compute the activity rates for the activity cost pools. 3. Using the activity rates you have computed, determine the total cost and the average cost per thousand square feet of each of the following jobs according to the activity-based costing system. A. A routine 1,000-square-foot asbestos removal job. B. A routine 2,000-square-foot asbestos removal job. C. A non-routine 2,000-square-foot asbestos removal job.

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 02:30
Acompany factory is considered which type of resource a.land b.physical capital c.labor d.human capital
Answers: 2
question
Business, 22.06.2019 08:30
Blank is the internal operation that arranges information resources to support business performance and outcomes
Answers: 2
question
Business, 22.06.2019 17:00
Serious question, which is preferred in a business? pp or poopoo?
Answers: 1
question
Business, 22.06.2019 18:00
Bond j has a coupon rate of 6 percent and bond k has a coupon rate of 12 percent. both bonds have 14 years to maturity, make semiannual payments, and have a ytm of 9 percent. a. if interest rates suddenly rise by 2 percent, what is the percentage price change of these bonds?
Answers: 2
You know the right answer?
Mercer Asbestos Removal Company removes potentially toxic asbestos insulation and related products f...
Questions
question
Mathematics, 14.02.2021 09:50
question
Mathematics, 14.02.2021 09:50
question
World Languages, 14.02.2021 09:50
question
English, 14.02.2021 09:50
question
History, 14.02.2021 09:50
Questions on the website: 13722362