subject
Business, 26.05.2021 01:00 aksambo4707

Compute Lead Time Jackson Fabricators Inc. machines metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are machined through two processes: milling and finishing. Parts are produced in batch sizes of 40 parts. A part requires 6 minutes in milling and 8 minutes in finishing. The move time between the two operations for a complete batch is 5 minutes. Under the lean philosophy, the part is produced in a cell that includes both the milling and finishing operations. The operating time is unchanged; however, the batch size is reduced to 5 parts and the move time is eliminated. Determine the value-added, non-value-added, and total lead times, and the value-added ratio under the traditional and lean manufacturing methods. If required, round percentages to one decimal place. Traditional Philosophy Lean Manufacturing Philosophy Value-added time fill in the blank 1 min fill in the blank 2 min Non-value-added time fill in the blank 3 min fill in the blank 4 min Total lead time fill in the blank 5 min fill in the blank 6 min Value-added ratio (as a percent) fill in the blank 7 % fill in the blank 8 %

ansver
Answers: 3

Another question on Business

question
Business, 22.06.2019 16:50
Identify and describe a variety of performance rating scales that can be used in organizations including graphical scales, letter scales, and numeric scales.
Answers: 2
question
Business, 22.06.2019 20:40
Spartan credit bank is offering 7.5 percent compounded daily on its savings accounts. you deposit $5,900 today. a. how much will you have in the account in 4 years? (use 365 days a year. do not round intermediate calculations and round your answer to 2 decimal places, e.g., 32.16.) b. how much will you have in the account in 12 years? (use 365 days a year. do not round intermediate calculations and round your answer to 2 decimal places, e.g., 32.16.) c. how much will you have in the account in 19 years?
Answers: 2
question
Business, 22.06.2019 21:20
How success was the first day of the bus boycott
Answers: 1
question
Business, 22.06.2019 22:40
Problem 3: access control pokeygram, a cutting-edge new email start-up, is setting up building access for its employees. there are two types of employees: managers and engineers, and there are three departments: security, networking, and human resoures. each employee works in a single department, and each department is housed on a different floor. managers are allowed access to any floor, while engineers are allowed access only to their own floor. there are three badge-operated elevators, each going up to only one distinct floor. every employee has one badge. pokeygram wants to use the best possible access control method in order to minimize delay for the elevators (a) access control matrix, 1. which of the following would you recommend that pokeygram use: (b) access control lists, or (c) capabilities? make sure to justify your answer. 2. what, if any, would be the benefits (and/or disadvantages) of using rbac (role-based access control) in this situation? keep your solution for this problem limited to 10-12 lines of text.
Answers: 2
You know the right answer?
Compute Lead Time Jackson Fabricators Inc. machines metal parts for the automotive industry. Under t...
Questions
question
History, 27.10.2019 10:43
Questions on the website: 13722363