In order to come up with a realistic schedule , a manger wants to know how long it usually takes an employee to complete a task which statical measurement is the manager most likely to use ?

ansver
Answers: 2

Another question on Computers and Technology

question
Computers and Technology, 23.06.2019 03:10
Acomputer has a two-level cache. suppose that 60% of the memory references hit on the first level cache, 35% hit on the second level, and 5% miss. the access times are 5 nsec, 15 nsec, and 60 nsec, respectively, where the times for the level 2 cache and memory start counting at the moment it is known that they are needed (e.g., a level 2 cache access does not even start until the level 1 cache miss occurs). what is the average access time?
Answers: 1
question
Computers and Technology, 23.06.2019 07:30
What key should you press and hold to select and open multiple files at one time? enter alt control esc
Answers: 1
question
Computers and Technology, 23.06.2019 09:10
(328 inc. 448 ind. 480 in25. john has a collection of toy cars. he has 2 red cars, 4 blue cars, 4 black cars, and 6 yellowcars. what is the ratio of red cars to yellow cars? a. 1: 2b. 1: 3c. 1: 626. the net of a right triangular prism is shown below.
Answers: 2
question
Computers and Technology, 23.06.2019 18:30
Report all segments of identity by descent longer than 20 polymorphisms between pairs of individuals in the following cohort of 15 individuals across 49 polymorphisms: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 numeric input 2 points possible (graded) you have 2 attempts to complete the assignment below. for example if the sequence is "bcd", which occurs in "abcdef" , the starting point would be 2 (b), and the finishing point would be 4(d). individuals 7,10 between positions
Answers: 1
You know the right answer?
In order to come up with a realistic schedule , a manger wants to know how long it usually takes an...
Questions
question
Mathematics, 14.07.2020 21:01
Questions on the website: 13722360