subject
Engineering, 06.12.2019 22:31 bearbri5851

The correct statement about the relation between the shear stress (force) at the surface for laminar and turbulent flow over a flat plate is. o the laminar shear stress is greater because the fluid viscosity is not important in turbulent flow o the turbulent shear stress is greater because the mixing dissipates more energy, producing a greater stress at the wall o the laminar and turbulent shear stresses are equal at the same position (x) along the plate, but since turbulence occurs farther down the plate it produces a higher shear stress the laminar shear stress is less because the boundary is thinner in the laminar regime.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Ariver flows from north to south at 8 km/h. a boat is to cross this river from west to east at a speed of 20 km/h (speed of the boat with respect to the earth/ground). at what angle (in degrees) must the boat be pointed upstream such that it will proceed directly across the river (hint: find the speed of the boat with respect to water/river)? a 288 b. 21.8 c. 326 d. 30.2
Answers: 3
question
Engineering, 04.07.2019 18:10
Afull journal bearing has a journal diameter of 27 mm, with a unilateral tolerance of -0.028 mm. the bushing bore has a diameter of 27.028 mm and a unilateral tolerance of 0.04 mm. the l/d ratio is 0.5. the load is 1.3 kn and the journal runs at 1200 rev/min. if the average viscosity is 50 mpa-s, find the minimum film thickness, the power loss, and the side flow for the minimum clearance assembly.
Answers: 1
question
Engineering, 04.07.2019 18:20
Atank with constant volume contains 2.27 kg of a mixture of water phases (liquid-vapor). in the initial state the temperature and the quality are 127 °c and 0.6, respectively. the mixture is heated until the temperature of 160 oc is reached. illustrate the process in a t-v diagram. then, determine (1) the mass of the vapor in kg at the initial state, (2) the final pressure in kpa.
Answers: 3
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
The correct statement about the relation between the shear stress (force) at the surface for laminar...
Questions
question
Mathematics, 05.05.2020 12:45
question
Mathematics, 05.05.2020 12:45
question
English, 05.05.2020 12:45
question
Mathematics, 05.05.2020 12:45
Questions on the website: 13722361