subject
Engineering, 19.12.2019 03:31 coolgirl5679

Chairs and bolsters are used to:

a. keep formwork from moving during concrete placement.
b. maintain proper spacing between members during installation of precast concrete members.
c. during posttensioning of concrete slabs.
d. splice reinforcing bars that require greater length.
e. support reinforcing bars in beams and slabs, prior to concrete placement.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
Apipe with an outside diameter of 15 cm is exposed to an ambient air and surrounding temperature of -20°c. the pipe has an outer surface temperature of 65°c and an emissivity of 0.85. if the rate of heat loss from the pipe surface is 0.95 kw per meter of length, the external convective heat transfer coefficient (h) is: (a) 12.5 w/m"k (b) 18.6 w/mk (c) 23.7 w/mk (d) 27.9 w/mk (e) 33.5 w/mk
Answers: 1
question
Engineering, 04.07.2019 18:10
Draw the engineering stress-strain curve for (a) bcc; (b) fcc metals and mark important points.
Answers: 1
question
Engineering, 04.07.2019 18:10
Courses that are developed by subject matter experts, internal or extemal to the college or university. these programs are marketed by the school (clo2) marks a)-vocational schools b)-vendor training c)-colleges & universities d)-continuing education programs
Answers: 2
You know the right answer?
Chairs and bolsters are used to:

a. keep formwork from moving during concrete placemen...
Questions
question
Mathematics, 07.10.2019 07:00
question
History, 07.10.2019 07:00
question
Biology, 07.10.2019 07:00
question
History, 07.10.2019 07:00
Questions on the website: 13722361