Engineering, 19.12.2019 09:31 annaharmon283
When employee was climbing a metal ladder to head an electrical joe to the journeyman installer on the scaffold above 5 feet above him when the victim hd third run from the bottom of the ladder he received electric shocks they couldn’t the investigation review duty extension cord henry missing grounding problem in that a conductor of the green candy and the jose frame the joke was not double insulated what could’ve been done to prevent this accident
Answers: 3
Engineering, 04.07.2019 03:10
What precautions should you take to prevent injuries when dealing with heavy loads?
Answers: 1
Engineering, 04.07.2019 18:10
Water in a partially filled large tank is to be supplied to the roof top, which is 8 m above the water level in the tank, through a 2.2-cm-internal-diameter pipe by maintaining a constant air pressure of 300 kpa (gage) in the tank. if the head loss in the piping is 2 m of water, determine the discharge rate of the supply of water to the roof top in liters per second.
Answers: 3
Engineering, 04.07.2019 18:20
Vibration monitoring this technique uses the noise or vibration created by mechanical equipment and in seme cases by plant systems to detemine their actual condtion. a)- true b)- false
Answers: 2
Engineering, 04.07.2019 18:20
Find the kinematic pressure of 160kpa. for air, r-287 j/ kg k. and hair al viscosity of air at a temperature of 50°c and an absolute (10 points) (b) find the dynamic viscosity of air at 110 °c. sutherland constant for air is 111k
Answers: 3
When employee was climbing a metal ladder to head an electrical joe to the journeyman installer on t...
Physics, 30.11.2020 18:30
Physics, 30.11.2020 18:30
English, 30.11.2020 18:30
Mathematics, 30.11.2020 18:30
Mathematics, 30.11.2020 18:30
History, 30.11.2020 18:30
Biology, 30.11.2020 18:30
History, 30.11.2020 18:30