subject
Engineering, 18.02.2020 06:16 chelton3813

Suppose Q1 (0.0, - 3.0 M, 0.0) = 4.0 nC, Q2 (0.0, 3.0 m, 0.0) = 4.0 nC, and Q3 (4.0 m, 0.0, 0.0) = 1.0 nC.

a) Find the total force acting on the charge Q3.
b) Repeat the problem after changing the charge of Q2 to -4.0 nC.
c) Find the electric field intensity at the location of Q3 for parts a) and b)

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Asingle-geared blanking press has a stroke of 200 mm and a rated capacity of 320 kn. a cam driven ram is assumed to be capable of delivering the full press load at constant force during the last 15 percent of a constant-velocity stroke. the camshaft has an average speed of 90 rev/min and is geared to the flywheel shaft at a 6: 1 ratio. the total work done is to include an allowance of 16 percent for friction a) estimate the maximum energy fluctuation b) find the rim weight for an effective diameter of 1.2 m and a coefficient of speed fluctuation of 0.10
Answers: 1
question
Engineering, 04.07.2019 18:10
Consider a large isothermal enclosure that is maintained at a uniform temperature of 2000 k. calculate the emissive power of the radiation that emerges from a small aperture on the enclosure surface. what is the wavelength ? , below which 10% of the emission is concentrated? what is the wavelength ? 2 above which 10% of the emission is concentrated? determine the wavelength at which maximum spectral emissive power occurs. what is the irradiation incident on a small object placed inside the enclosure?
Answers: 2
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
question
Engineering, 04.07.2019 19:20
Amass-spring-viscous damper system of mass 3 kg has a frequency of 100 rad/s and is critically damped. its initial conditions are x(0)-3 mm and (0)-2.3 m/s. does the system overshoot its equilibrium position? prove your answer
Answers: 1
You know the right answer?
Suppose Q1 (0.0, - 3.0 M, 0.0) = 4.0 nC, Q2 (0.0, 3.0 m, 0.0) = 4.0 nC, and Q3 (4.0 m, 0.0, 0.0) = 1...
Questions
question
English, 28.07.2021 18:30
question
Biology, 28.07.2021 18:30
question
Mathematics, 28.07.2021 18:30
question
Mathematics, 28.07.2021 18:30
Questions on the website: 13722360