subject
Engineering, 25.02.2020 23:11 jaylabeatty44

1. A truck with heaped capacity of 10 cy is used to disposed to excavated material at dumpsite of 5 miles from the job site. The average velocity of the is 30 mph. The dump time is 30 second and load time is 50 second. Determine the production capacity of the dump truck.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 14:10
If the thermal strain developed in polyimide film during deposition is given as 0.0044. assume room temperature is kept at 17.3 c, and thermal coefficient of expansion for the film and the substrate are 54 x 10^-6c^-1 and 3.3 x 10^-6c^-1respectively. calculate the deposition temperature.
Answers: 3
question
Engineering, 04.07.2019 18:10
Which of the following refers to refers to how well the control system responds to sudden changes in the system. a)-transient regulation b)- distributed regulation c)-constant regulation d)-steady-state regulation
Answers: 1
question
Engineering, 04.07.2019 18:10
Which of the following controllers anticipates the future from the slope of errors over time? a)-proportional b)-on/off c)-integral d)-derivative.
Answers: 2
question
Engineering, 04.07.2019 18:10
Awall of 0.5m thickness is to be constructed from a material which has average thermal conductivity of 1.4 w/mk. the wall is to be insulated with a material having an average thermal conductivity of 0.35 w/mk so that heat loss per square meter shall not exceed 1450 w. assume inner wall surface temperature of 1200Β°c and outer surface temperature of the insulation to be 15Β°c. calculate the thickness of insulation required.
Answers: 3
You know the right answer?
1. A truck with heaped capacity of 10 cy is used to disposed to excavated material at dumpsite of 5...
Questions
question
Mathematics, 26.06.2019 04:40
question
English, 26.06.2019 04:50
question
Mathematics, 26.06.2019 04:50
Questions on the website: 13722363