subject
Engineering, 23.04.2020 16:20 lwewahdu

A 3.5 in diameter through hole is to be cut in a block of titanium (valence = 4) by electrochemical machining. The block is 2.0 in thick. To speed the cutting process, the electrode tool will have a center hole of 3.0 in, which will produce a center core that can be removed after the tool breaks through. If the efficiency of the ECM operation is 90%, what current is required to complete the cutting

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 04.07.2019 12:10
On a average work day more than work place firs are reorted
Answers: 1
question
Engineering, 04.07.2019 18:20
Derive the correction factor formula for conical nozzle i=-(1+ cosa) and calculate the nozzle angle correction factor for a nozzle whose divergence hal-fangle is 13 (hint: assume that all the mass flow originates at the apex of the cone.
Answers: 3
You know the right answer?
A 3.5 in diameter through hole is to be cut in a block of titanium (valence = 4) by electrochemical...
Questions
question
Mathematics, 16.09.2019 01:50
question
Mathematics, 16.09.2019 01:50
question
Mathematics, 16.09.2019 01:50
Questions on the website: 13722359