A segment of four-lane freeway (two lanes in each direction) has a 3% upgrade that is 1500 ft long followed by a 1000-ft 4% upgrade. It has 12-ft lanes and 3-ft shoulders. The directional hourly traffic flow is 2000 vehicles with 3% Single-Unit Trucks (SUTs) and 3% Tractor Trailers (TTs). The total ramp density for this freeway segment is 2.33 ramps per mile. If the peak-hour factor is 0.90, what is the level of service of this compound-grade freeway segment

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Compute the pressure drop of 30°c air flowing with a mean velocity of 8 m/s in a circular sheet-metal duct 300 mm in diameter and 15 m long. use a friction factor, f 0.02, and pair = 1.1644 kg/m a. 37.26 pa b. 25.27 pa n c. 29.34 pa d. 30.52 pa
Answers: 1
question
Engineering, 04.07.2019 18:20
Steam enters a converging nozzle at 3.0 mpa and 500°c with a at 1.8 mpa. for a nozzle exit area of 32 cm2, determine the exit velocity, mass flow rate, and exit mach number if the nozzle: negligible velocity, and it exits (a) is isentropic (b) has an efficiency of 94 percent
Answers: 2
question
Engineering, 04.07.2019 18:20
For a gate width of 2 m into the paper, determine the force required to hold the gate abc at its location.
Answers: 1
question
Engineering, 04.07.2019 19:10
What are the major differences between injection molding and extrusion?
Answers: 2
You know the right answer?
A segment of four-lane freeway (two lanes in each direction) has a 3% upgrade that is 1500 ft long f...
Questions
question
English, 11.05.2021 03:30
question
Mathematics, 11.05.2021 03:30
question
Mathematics, 11.05.2021 03:30
Questions on the website: 13722361