subject
Engineering, 09.05.2020 03:57 davidleew24

Prepare a construction schedule for the following work items to be installed by the contractor. Identify a critical path.
Include:
β€’ Submittal preparation by contractor,
β€’ Submittal review (1 week by engineer)
β€’ Order lead time (2 weeks for earthwork and pavement markings; 4 weeks for drainage materials, 6 weeks for paving, curb and drainage castings; 12 weeks for traffic and lighting: 16 weeks for trees)
β€’ Order of construction, duration of items, and interrelation between items.
β€’ Keep crews consistently employed - do not assume you have any other projects for the crews to work on.
β€’ Keep crews out of each other's way
β€’ Earthwork/drainage/concrete/curb crew - one set of people and equipment
β€’ Street lighting foundations (excavation and concrete piers) 8/day/crew
β€’ Traffic signal foundations (excavation and concrete piers) 4/day/crew
β€’ Drainage systems mainline (trench, pipe, backfill with native soil, compaction
6-inch lifts, trench pavement repair) 100 ft/day crew.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Abrake has a normal braking torque of 2.8 kip in and heat-dissipating cast-iron surfaces whose mass is 40 lbm. suppose a load is brought to rest in 8.0 s from an initial angular speed of 1600 rev/min using the normal braking torque; estimate the temperature rise of the heat dissipating surfaces.
Answers: 3
question
Engineering, 04.07.2019 18:10
Fluids at rest possess no flow energy. a)- true b)- false
Answers: 3
question
Engineering, 04.07.2019 18:10
Shafts are machine elements that are used to a) carry axial loads b) direct shear loads c) transmit power d) rotate at constant speed e) none of the above circular and square shafts subjected to the same torque under the same circum behave a) the same way b) almost the same way
Answers: 2
question
Engineering, 04.07.2019 18:10
Atmospheric air has a temperature (dry bulb) of 80Β° f and a wet bulb temperature of 60Β° f when the barometric pressure is 14.696 psia. determine the specific humidity, grains/lb dry air. a. 11.4 c. 55.8 d. 22.5 b. 44.1
Answers: 1
You know the right answer?
Prepare a construction schedule for the following work items to be installed by the contractor. Iden...
Questions
question
Mathematics, 04.07.2019 19:30
question
Social Studies, 04.07.2019 19:30
Questions on the website: 13722360