subject
Engineering, 01.08.2020 21:01 coreen9

Qu. 08-18 Design a double-dwell cam to move a... Design a double-dwell cam to move a follower from 0 to 2.5 in. in 60°, dwell for 120°, fall 2.5 in. in 30°, and dwell for the remainder. The total cycle must take 4 sec. Size the cam for a 1-in. radius roller follower considering pressure angle and radius of curvature. Use eccentricity only if necessary to balance these functions. Plot both these functions. Draw the cam profile. Repeat this for a flat-faced follower. Which one would you use?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Coiled springs ought to be very strong and stiff. si3n4 is a strong, stiff material. would you select this material for a spring? explain.
Answers: 2
question
Engineering, 04.07.2019 18:10
Which of the following refers to refers to how well the control system responds to sudden changes in the system. a)-transient regulation b)- distributed regulation c)-constant regulation d)-steady-state regulation
Answers: 1
question
Engineering, 04.07.2019 18:20
What is the heat treatment of metals? what is the benefit of it? why and how it's useful? answer in details, do not write by hand.
Answers: 3
question
Engineering, 04.07.2019 18:20
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
You know the right answer?
Qu. 08-18 Design a double-dwell cam to move a... Design a double-dwell cam to move a follower from 0...
Questions
question
History, 23.02.2021 23:20
Questions on the website: 13722361