subject
Engineering, 27.08.2020 23:01 19thomasar

A software firm is going to develop an application for the automation of various office activities within an organization. In the office where application needs to deployed, different tasks are carried out on daily basis which are distributed among a hierarchy of employees working at the different levels. It is decided to use system architecture approach which deploys different server machines to handle application logic, data and files of the system and employees will access the system through a GUI installed on their machines. Question: In order to make the system more maintainable, which architecture partitioning approach from the following would you suggest for implementing this application design? · Vertical partitioning · Horizontal partitioning

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Aloaded platform of total mass 500 kg is supported by a dashpot and by a set of springs of effective stiffness 72 kn/m. it is observed that when the platform is depressed through a distance x = 12.5 cm below its equilibrium position and then released without any initial velocity; it reaches its equilibrium position in the shortest possible time without overshoot. find the position and velocity of the loaded platform 0.10 sec. after its release. if a further load of 400 kg is added to the platform, find, i) the frequency of damped vibrations, and i) the amplitude of vibration after 2 complete oscillations, given that the initial amplitude is 15 cm.
Answers: 1
question
Engineering, 04.07.2019 18:10
Thermal stresses are developed in a metal when its a) initial temperature is changed b) final temperature is changed c) density is changed d) thermal deformation is prevented e) expansion is prevented f) contraction is prevented
Answers: 2
question
Engineering, 04.07.2019 18:10
Manometers are good examples of measuring instruments, nowadays they are not as common as before. a)-capacitive probe gauges b)-gravitational gauges deformation ) gauges d)-digital gauges
Answers: 1
question
Engineering, 04.07.2019 18:20
Have a greater impact on maintenance productivity than any other support group. (clo5) a)-the top management b)-inventory and purchasing c)-sub-contracting d)-cmms
Answers: 2
You know the right answer?
A software firm is going to develop an application for the automation of various office activities w...
Questions
question
Mathematics, 25.02.2020 01:00
question
Mathematics, 25.02.2020 01:00
Questions on the website: 13722362