subject
Engineering, 17.05.2021 16:10 creepycrepes

Got a new work project. I will need help to create excel documents that is connected to our shipping conveyor system(Fortna) , Warehouse management System(Provia), Lighting pick system(LP) and the cheat cheat that we use to look up the remaining daily customers orders (This is the an Excel document with all orders that is shipped to customers and all orders that we are still working on): 1.This document will help us give report on information like how many boxes diverted from the main conveyor to specific trailer: - separate them according to boxes sizes - separate them according to service level 2. How much our pickers (by name) are picking individually per hour Is this something you or your colleagues can work on but the issue will be I will have to share my laptop screen(Zoom) to access the organization systems? Thanks

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Aloaded platform of total mass 500 kg is supported by a dashpot and by a set of springs of effective stiffness 72 kn/m. it is observed that when the platform is depressed through a distance x = 12.5 cm below its equilibrium position and then released without any initial velocity; it reaches its equilibrium position in the shortest possible time without overshoot. find the position and velocity of the loaded platform 0.10 sec. after its release. if a further load of 400 kg is added to the platform, find, i) the frequency of damped vibrations, and i) the amplitude of vibration after 2 complete oscillations, given that the initial amplitude is 15 cm.
Answers: 1
question
Engineering, 04.07.2019 18:10
If a particle moves along a path such that r : (3 sin t) m and ? : 2t rad, where t is in seconds. what is the particle's acceleration in m/s in 4 seconds? a)- 16.43 b)- 16.29 c)- 15.21 d)- 13.79
Answers: 1
question
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
You know the right answer?
Got a new work project. I will need help to create excel documents that is connected to our shipping...
Questions
question
Mathematics, 26.02.2020 23:20
question
Mathematics, 26.02.2020 23:20
Questions on the website: 13722360