Mathematics, 18.10.2019 22:30 laytonlutz
Exercises problems for structural engineering 1. when estimating the live load for a new bridge design, you want that estimate to be conservative. in other words, you want to err on the safe side by basing the estimate on the worst possible scenario, such as bumper-to-bumper traffic, the heaviest vehicles, or the worst environmental conditions. with this in mind, estimate the live load for the following proposed bridge designs.
a. a foot bridge with a 174. ft span and two separate 4. ft wide lanes to allow for pedestrian traffic in both directions.
b. a four-lane highway bridge with a 300. ft span.
Answers: 1
Mathematics, 21.06.2019 17:30
Two customers went to a post office. first customer paid $12 for 14 and 5 envelopes the second paid 24.80 for 10 postcards and 15 envelopes. what is cost of each envelope?
Answers: 1
Mathematics, 21.06.2019 20:00
An investment decreases in value by 30% in the first year and decreases by 40% in the second year. what is the percent decrease in percentage in the investment after two years
Answers: 1
Exercises problems for structural engineering 1. when estimating the live load for a new bridge desi...
Mathematics, 30.08.2020 01:01
Geography, 30.08.2020 01:01
Biology, 30.08.2020 01:01
History, 30.08.2020 01:01
Geography, 30.08.2020 01:01
Computers and Technology, 30.08.2020 01:01
Mathematics, 30.08.2020 01:01
Arts, 30.08.2020 01:01