subject
Mathematics, 07.11.2019 04:31 ozzy1146

The article "approximate methods for estimating hysteretic energy demand on plan-asymmetric buildings" (m. rathhore, a. chowdhury, and s. ghosh, journal of earthquake engineering, 2011: 99–123) presents a method, based on modal pushover analysis, of estimating the hysteretic energy demand placed on a structure by an earthquake. a sample of 18 measurements had a mean error of 457.8 knm with a standard deviation of 317.7 knm. an engineer claims that the meth

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 14:30
Aswimming pool has an input pump for filling the pool and an output pump for emptying the pool. the input pump can fill the pool in 3 hours, and the output pump can drain the pool in 5 hours. as you go to bed, the pool is full, but a neighbor’s kid turns on the output pump. at midnight, you awake to find the pool half empty. immediately, you turn on the input pump, but you are sleepy and forget to turn off the output pump. at what time will the pool become full?
Answers: 1
question
Mathematics, 21.06.2019 16:20
The lengths of nails produced in a factory are normally distributed with a mean of 4.91 centimeters and a standard deviation of 0.05 centimeters. find the two lengths that separate the top 4% and the bottom 4%. these lengths could serve as limits used to identify which nails should be rejected. round your answer to the nearest hundredth, if necessary.
Answers: 3
question
Mathematics, 21.06.2019 18:50
If x = -2, then x 2-7x+10 equals a. 0 b.20 c.28
Answers: 1
question
Mathematics, 21.06.2019 22:40
Find the missing factor. write your answer inexponential form.9^2=9^4×
Answers: 1
You know the right answer?
The article "approximate methods for estimating hysteretic energy demand on plan-asymmetric building...
Questions
question
Mathematics, 21.05.2020 04:12
question
Computers and Technology, 21.05.2020 04:57
question
Mathematics, 21.05.2020 04:57
Questions on the website: 13722361