Aconstruction company has 8 identical jobs. with everyone working the same rate, it takes 8 workers 6 days to complete 3 identical jobs. if 3 of the workers leave and each of the workers maintain their work pace, how long will it take the remaining 5 workers to complete the remaining jobs?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 20:30
The difference between two numbers is one. three times the larger number minus two times the smaller number is 9. what are the two numbers
Answers: 3
question
Mathematics, 21.06.2019 21:30
Item 1 solve for s. s+24=90 −114 −66 66 114
Answers: 2
question
Mathematics, 21.06.2019 22:00
  cassidy wants to cut the yellow fabric into strips that are 0.3 yards wide. how many strips of yellow fabric can cassidy make? yellow fabric 16 yards for $108.00.
Answers: 1
question
Mathematics, 21.06.2019 22:30
The party planning committee has to determine the number of tables needed for an upcoming event. if a square table can fit 8 people and a round table can fit 6 people, the equation 150 = 8x + 6y represents the number of each type of table needed for 150 people.
Answers: 1
You know the right answer?
Aconstruction company has 8 identical jobs. with everyone working the same rate, it takes 8 workers...
Questions
question
Mathematics, 16.07.2021 03:40
question
Mathematics, 16.07.2021 03:40
question
Social Studies, 16.07.2021 03:40
Questions on the website: 13722362