Four jobs have uniformly distributed processing times, independently distributed on [10,15],[15,20],[10,20], and [15,25] respectively. There are three identical processors. Whenever a processor completes a job, it gets the next job on the schedule.
(a) Calculate the expected makespan for the schedule 1,2,3,4.(b) Calculate the expected flowtime for the schedule 1,2,3,4.(c) Calculate the expected makespan for the schedule 4,1,2,3.(d) Calculate the expected flowtime for the schedule 4,1,2,3.(e) Which schedule is better for flowtime? for makespan?
Answers: 3
Mathematics, 20.06.2019 18:02
Is a deceasing linear model or an exponential decay model likely to be a better fit for the data about remembering? ?
Answers: 1
Mathematics, 22.06.2019 04:00
Which expression equals 9^3 sqrt 10 a. 5 sqrt 10 + 4 sqrt 10 b. 5^3 sqrt 10 + 4 ^3 sqrt 10 c. 5 sqrt 10 + 4^3 sqrt 10 d. 5^3 sqrt 10 + 4 sqrt 10
Answers: 1
Mathematics, 22.06.2019 04:30
Dagne measures and finds that she can do a vertical jump that is 27.5% of her height.if dagne is 48 inches tall, how high can she jump? enter your answer in the box. inches
Answers: 3
Four jobs have uniformly distributed processing times, independently distributed on [10,15],[15,20],...