Mathematics, 23.04.2020 01:54 tami5
Smith engineering is in the process of reviewing the salaries of their surveyors. During this review, the company found that an experienced surveyors can survey a roadbed in 6 hours. An apprentice surveyors needs 11 hours to survey the same stretch of road. If the two work together, find how long it takes them to complete the job. Answer this in hours
Answers: 2
Mathematics, 21.06.2019 16:00
Afurniture manufacturer produces chairs and sofas. each chair requires 10 yards of fabric, and each sofa requires 20 yards of fabric. the manufacturer has 300 yards of fabric available. to fulfill orders, the number of sofas must be at least twice the number of chairs. let x be the number of chairs and y the number of sofas. which inequalities are described in the problem? check all of the boxes that apply
Answers: 2
Mathematics, 21.06.2019 23:00
I'm at a bookstore with $\$35$ in my pocket and a $20\%$-off coupon. what is the cost of the most expensive book i can buy with my money and the coupon? (assume that there are books of every possible price in the bookstore. it's a large bookstore! )
Answers: 1
Mathematics, 21.06.2019 23:20
Sophia wrote an equation to represent the revenue of a movie theater for one day. she let x represent the number of child tickets sold and y represents the nunver of adult tickets sold. if a child ticket cost $4, an adult ticket cost $6, and the total revenue for the daybwas $420, which equation could sophia use to represent the number of chikd and adult tickets that were sold?
Answers: 1
Smith engineering is in the process of reviewing the salaries of their surveyors. During this review...
History, 20.03.2020 02:58
Business, 20.03.2020 02:58
English, 20.03.2020 02:58
Mathematics, 20.03.2020 02:58