subject
Mathematics, 05.05.2020 22:16 zacharoo10

The design of a concrete mix requires 2,314 lb/yd3 of gravel having a moisture content of 3.5% and absorption of 4.2%, and 899 lb/yd3 of sand having a moisture content of 5.7% and absorption of 1.4%, and 244 lb/yd3 of free water. What is the weight of the mixing water per cubic yard that should be used at the job site?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 13:30
Express the following as a function of a single angle, cos(60) cos(-20) - sin(60) sin(-20)
Answers: 3
question
Mathematics, 21.06.2019 16:30
Jackie purchased 3 bottles of water and 2 cups of coffee for the family for $7.35. ryan bought 4 bottles of water and 1 cup of coffee for his family for 7.15. how much does each bottle of water cost? how much does each cup of coffee cost?
Answers: 3
question
Mathematics, 21.06.2019 17:30
Terri makes a quilt using three sizes of fabric squares the side lenght of each fabric square is the square root of the area
Answers: 2
question
Mathematics, 21.06.2019 19:00
Ineed i been stuck on this question since yesterday
Answers: 1
You know the right answer?
The design of a concrete mix requires 2,314 lb/yd3 of gravel having a moisture content of 3.5% and a...
Questions
question
Physics, 19.11.2019 01:31
question
Geography, 19.11.2019 01:31
question
Mathematics, 19.11.2019 01:31
question
Chemistry, 19.11.2019 01:31
Questions on the website: 13722363