An assembly line must create one finished product every 3 minutes. The sum of the task times required to create a product is 700 seconds. What is the theoretical minimum number of workstations for this assembly line

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 12:30
What are the domain and range of f(x)=[1/5]x
Answers: 1
question
Mathematics, 21.06.2019 13:30
Lindsay is creating a bridge out of dried pasta and glue. in her plans, she sketches the graph to determine the lengths of the noodles, in centimeters, needed for the arch to increase the length of the bridge in 1 centimeter increments.which function did lindsay use to create her design? f(x) = (x – 5)2 + 8 f(x) = –(x + 5)2 + 8 f(x) = 0.5(x + 5)2 + 8 f(x) = –0.5(x – 5)2 + 8
Answers: 1
question
Mathematics, 21.06.2019 21:50
What is the 17th term in the arithmetic sequence in which a6 is 101 and a9 is 83
Answers: 3
question
Mathematics, 21.06.2019 22:40
Aclassmate thinks that solving a system by graphing gives an exact answer when the lines appear to cross at a grid point, but only an approximate answer when they don't. explain why this isn't true.
Answers: 3
You know the right answer?
An assembly line must create one finished product every 3 minutes. The sum of the task times require...
Questions
question
Mathematics, 25.03.2020 05:03
question
Biology, 25.03.2020 05:03
Questions on the website: 13722360