subject
Mathematics, 24.11.2020 23:40 NorbxrtThaG

B. F. Retread, a tire manufacturer, wants to select one of three feasible prototype designs for a new tire; A, B, C. Revenues
Low (0.30) Medium (0.50) High (0.20)
A 120,000 255,000 390,000
B 130,000 295,000 460,000
C 100,000 300,000 480,000

Required:
Calculate the highest value you would pay for a highly reliable forecast.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 22:30
Ineed big ! the cost of a school banquet is $25 plus $15 for each person attending. create a table, sketch the graph, and write an equation in slope-intercept and point-slope form that gives total cost as a function of the number of people attending. what is the cost for 77 people?
Answers: 1
question
Mathematics, 22.06.2019 00:40
If a distance of 75 yds is measured back from the edge of the canyon and two angles are measured , find the distance across the canyon angle acb = 50° angle abc=100° a=75 yds what does c equal?
Answers: 1
question
Mathematics, 22.06.2019 02:00
One of the problems with our current election system is? ?
Answers: 1
question
Mathematics, 22.06.2019 06:30
Addison painted her room. she had 5 0 5050 square meters to paint, and she painted at a constant rate. after 2 22 hours of painting, she had 3 5 3535 square meters left. let a t a(t)a, left parenthesis, t, right parenthesis denote the area to paint a aa (measured in square meters) as a function of time t tt (measured in hours). write the function's formula.
Answers: 2
You know the right answer?
B. F. Retread, a tire manufacturer, wants to select one of three feasible prototype designs for a ne...
Questions
question
Health, 19.10.2019 07:20
question
Social Studies, 19.10.2019 07:20
question
History, 19.10.2019 07:20
question
Spanish, 19.10.2019 07:20
question
Mathematics, 19.10.2019 07:20
Questions on the website: 13722360