subject
Mathematics, 10.03.2021 01:00 katyvillanueva05

During construction the workers need to mix dried bentonite into the concrete as it is being mixed to get the desired consistency. The workers decide to mix 800 mg of Bentonite to be mixed with 198 lb of concrete mix every 8 hours. The information for the concrete shows that 25-75 mg/kg per day is the appropriate mixture consistency. Are the workers within the desired range? (Note: 1kg = 2.2 lbs)

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 18:30
Thales was an ancient philosopher familiar with similar triangles. one story about him says that he found the height of a pyramid by measuring its shadow and his own shadow at the same time. if the person is 5-ft tall, what is the height of the pyramid in the drawing?
Answers: 3
question
Mathematics, 21.06.2019 21:00
Mr.zimmerman invested $25,000 in an account that draws 1.4 interest, compouneded annually. what is the total value of the account after 15 years
Answers: 1
question
Mathematics, 21.06.2019 21:00
Which expression is equivalent to 16 in exponential form? a) 4 ร— 4 b) 8 ร— 2 c) 23 d) 24
Answers: 2
question
Mathematics, 21.06.2019 23:00
72 the length of a side of a triangle is 36. a line parallel to that side divides the triangle into two parts of equal area. find the length of the segment determined by the points of intersection between the line and the other two sides of the triangle.
Answers: 1
You know the right answer?
During construction the workers need to mix dried bentonite into the concrete as it is being mixed t...
Questions
Questions on the website: 13722360