Mathematics, 17.09.2019 07:50 rayzambr
Shawn and ellie are construction workers. shawn can complete a concrete job in 4 hours, while ellie can complete it in 6 hours. the foreman says that it will take them 5 hours to complete it if they work together. explain each step in solving this equation, and determine if the foreman is correct or not.
Answers: 1
Mathematics, 21.06.2019 13:00
Can someone me my sister? she is in third grade. 50 points and brainlist! ones that are not answered. plz and thx!
Answers: 1
Mathematics, 21.06.2019 15:00
You put the following items into your rucksack. ham 600 g cheese 380 g tomatoes 270 g how much do all the ingredients weigh in total?
Answers: 1
Mathematics, 21.06.2019 19:30
Find the actual dimensions of the box. the side length are in meters and integers. the surface area of the box is 104 m2 and volume of the box is 60 m3.
Answers: 1
Shawn and ellie are construction workers. shawn can complete a concrete job in 4 hours, while ellie...
Mathematics, 14.02.2020 04:24
Mathematics, 14.02.2020 04:24
Mathematics, 14.02.2020 04:24
Computers and Technology, 14.02.2020 04:24
English, 14.02.2020 04:24
Computers and Technology, 14.02.2020 04:25