subject
Mathematics, 10.05.2021 19:00 kiaraangely100400

As part of the quality-control program for a catalyst manufacturing line, the raw materials (alumina and a binder) are tested for purity. The process requires that the purity of the alumina be greater than 84%. A random sample from a recent shipment of alumina yielded the following results (in percent): 93.2, 87.0, 92.1, 90.1, 87.1, and 93.4.
A hypothesis test will be done to determine whether or not to accept the shipment.
a. State the appropriate null and alternate hypotheses.
b. Compute the P-value.
c. Should the shipment be accepted? Explain.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 14:30
Mr switzer needs to buy new 1-foot tiles to cover his bathroom floor. the floor is 12 feet long and 8 feet wide. each square foot of tile will cost $1.79. in dollars what will be the total cost of the tiles he needs to buy.
Answers: 3
question
Mathematics, 21.06.2019 19:10
How many different three-digit numbers can be formed using the digits 1 comma 2 comma 9 comma 6 comma 4 comma 3 comma and 8 without repetition? for example, 664 is not allowed.
Answers: 1
question
Mathematics, 22.06.2019 00:00
Alice is paying her bill at a restaurant. but tax on the cost of a male is 5%. she decides to leave a tip 20% of the cost of the meal plus the tax
Answers: 3
question
Mathematics, 22.06.2019 01:30
Use the linear combination method to solve the system of equations. explain each step of your solution. if steps are not explained, you will not receive credit for that step. 2 + 9 = −26 −3 − 7 = 13
Answers: 2
You know the right answer?
As part of the quality-control program for a catalyst manufacturing line, the raw materials (alumina...
Questions
question
Computers and Technology, 22.08.2019 04:10
question
Computers and Technology, 22.08.2019 04:10
Questions on the website: 13722361