subject
Mathematics, 23.06.2021 01:20 I1YBYY

Managers at an automobile manufacturing plant would like to estimate the mean completion time of an assembly line operation, . The managers plan to choose a random sample of completion times and estimate via the sample. Assuming that the standard deviation of the population of completion times is minutes, what is the minimum sample size needed for the managers to be confident that their estimate is within minutes of

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 20.06.2019 18:04
Acollege is planning to construct a rectangular parking lot on land bordered on one side by a highway. the plan is to use 680 feet of fencing to fence off the other three sides. what dimensions should the lot have if the enclosed area is to be a maximum?
Answers: 1
question
Mathematics, 21.06.2019 18:30
Kayla wants to find the width, ab, of a river. she walks along the edge of the river 65 ft and marks point c. then she walks 25 ft further and marks point d. she turns 90° and walks until her location, point a, and point c are collinear. she marks point e at this location, as shown. (a) can kayla conclude that δ and δ are similar? why or why not? (b) suppose de = 15 ft. what can kayla conclude about the width of the river?
Answers: 2
question
Mathematics, 22.06.2019 00:20
What is the slope of the line passing through the points (3, 3) and (5, 7) ? 1. 2 2. 1/2 3. −2 4. −1/2
Answers: 2
question
Mathematics, 22.06.2019 05:10
Find the coordinates for the center for this circle (x+3)^2+(y-5)^2=25
Answers: 3
You know the right answer?
Managers at an automobile manufacturing plant would like to estimate the mean completion time of an...
Questions
question
Mathematics, 14.04.2020 23:13
Questions on the website: 13722362