subject
Mathematics, 31.07.2019 23:00 kristenhernandez74

Ineed more math , the! cement truck a can pour 200 cubic ft of concrete in 20 minutes. it only takes truck b 15 minutes to do the same job. if they both work together, how long will it take them to pour the 200 cubic feet? i need setting up the problem and solving it, you!

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
Mr and mrs smith buy tickets for themselves and their four children. the cost of an adult ticket is ? 6 more than the adult ticket. the total cost of the six tickets is ? 40.50 work out the cost of an adult ticket. in your working let c be the cost of the child ticket and a be the cost of the adult ticket.
Answers: 1
question
Mathematics, 21.06.2019 19:00
Abag of jelly beans contain 13 pink, green, 20 yellow, 10 black, 7 red, and 11 orange jelly beans. approximately what percent of the jelly beans are pink and yellow?
Answers: 1
question
Mathematics, 21.06.2019 19:30
Find the 6th term of the expansion of (2p - 3q)11. a. -7,185,024p4q7 c. -7,185p4q7 b. -7,185,024p6q5 d. -7,185p6q5 select the best answer from the choices provided a b c d
Answers: 1
question
Mathematics, 21.06.2019 21:00
Circle a has a diameter of 7 inches, a circumference of 21.98 inches, and an area of 38.465 square inches. the diameter of circle b is 6 inches, the circumference is 18.84 inches, and the area is 28.26 square inches. part a: using the formula for circumference, solve for the value of pi for each circle. (4 points) part b: use the formula for area and solve for the value of pi for each circle. (4 points)
Answers: 2
You know the right answer?
Ineed more math , the! cement truck a can pour 200 cubic ft of concrete in 20 minutes. it only take...
Questions
question
English, 21.01.2020 01:31
question
Biology, 21.01.2020 01:31