subject
Physics, 16.07.2019 05:20 avaleasim

An assembly line with 17 tasks is to be balanced. the longest task is 2.4 minutes, and the total time for all tasks is 18 minutes. the line will operate for 450 minutes per day. a. what are the minimum and maximum cycle times? b. what range of output is theoretically possible for the line? c. what is the minimum number of work stations needed if the maximum output rate is to be sought? d. what cycle time will provide an output rate of 125 units per day? e. what output potential will result if the cycle time is (1) 9 minutes? (2) 15 minutes?

ansver
Answers: 2

Another question on Physics

question
Physics, 22.06.2019 12:30
What is the equation for electrical work?
Answers: 3
question
Physics, 23.06.2019 00:00
A15,000 kg rocket traveling at +230 m/s turns on its engines. over a 6.0 s period it burns 1,000 kg of fuel. an observer on the ground measures the velocity of the expelled gases to be −1,200 m/s.
Answers: 3
question
Physics, 23.06.2019 01:00
Given the data calculated in parts a, b, c, and d, determine the initial rate for a reaction that starts with 0.85 m of reagent a and 0.70 m of reagents b and c?
Answers: 1
question
Physics, 23.06.2019 01:00
Suppose that two objects attract each other with a gravitational force of 16 units. if the distance between the two objects is double, what is the new force of attraction between the two objects?
Answers: 3
You know the right answer?
An assembly line with 17 tasks is to be balanced. the longest task is 2.4 minutes, and the total tim...
Questions
question
Chemistry, 01.01.2021 16:00
question
English, 01.01.2021 16:00
question
Chemistry, 01.01.2021 16:00
Questions on the website: 13722359