subject
Physics, 13.02.2020 00:42 sduquesnay23ocesdcom

A cable that weighs 8 lb/ft is used to lift 900 lb of coal up a mine shaft 650 ft deep. Find the work done. Show how to approximate the required work by a Riemann sum. (Let x be the distance in feet below the top of the shaft. Enter xi* as xi.)

ansver
Answers: 1

Another question on Physics

question
Physics, 22.06.2019 08:00
A0.580-kg rock is tied to the end of a string and is swung in a circle with a radius of 0.500 meters. the velocity of the rock is 4.50 m/s. what is the centripetal force acting on the rock? 15.5 n 5.22 n 69.8 n 23.5 n
Answers: 2
question
Physics, 22.06.2019 12:00
An architect plans to use solar energy to heat the next house he designs. what principle of absorption and infrared energy can be applied to the design of the new house? how could she apply to those principals?
Answers: 2
question
Physics, 23.06.2019 01:40
(8%) problem 12. a bowling ball of mass mb 3 kg 's rolled down the lane with a velocity ofy-2/ m s lt strikes a single remaining pin mp 0.93 kg head on. after the collision the bowling ball has a velocity (in the same direction) of v2 1.1 m/s. = β–² 33% part (a) write an expression for the velocity of pin in the horizontal direction after the impact, im ,, 33% part (b) what is the pins speed in ms? 33% part (c) assuming the coefficient of friction s ΞΌ,-0.1. how far in meters could the pin slide before stopping if it doesn't topple?
Answers: 1
question
Physics, 23.06.2019 03:00
Which explanation most accurately describes convection within the ocean
Answers: 2
You know the right answer?
A cable that weighs 8 lb/ft is used to lift 900 lb of coal up a mine shaft 650 ft deep. Find the wor...
Questions
question
Mathematics, 05.05.2020 08:19
question
Mathematics, 05.05.2020 08:19
question
Mathematics, 05.05.2020 08:19
Questions on the website: 13722361