subject
Physics, 19.08.2019 22:30 bendlogan2687

Calculate the amount of work done when a grocery store stocker uses 120n of force to lift a sack of flour 1.5m onto a shelf

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 22:00
Let v1, v2, w be three linearly independent vectors in r 3 . that is, they do not all lie on the same plane. for each of the following (infinite) set of vectors, carefully sketch it in r 3 , and determine whether or not it is a vector space (i.e., a subspace of r 3 ). explain your reasoning
Answers: 2
question
Physics, 22.06.2019 11:00
Afisherman notices that his boat is moving up and down periodically without any horizontal motion, owing to waves on the surface of the water. it takes a time of 2.20 s for the boat to travel from its highest point to its lowest, a total distance of 0.670 m . the fisherman sees that the wave crests are spaced a horizontal distance of 5.80 m apart. (a) how much is the wavelength? (b) find the period of the wave. (c) how fast are the waves traveling? (d) what is the amplitude a of each wave?
Answers: 3
question
Physics, 22.06.2019 12:00
Explain why electric current cannot exist if a current doesn't have a voltage source.
Answers: 2
question
Physics, 22.06.2019 15:00
What is the role of lenses in microscopy?
Answers: 2
You know the right answer?
Calculate the amount of work done when a grocery store stocker uses 120n of force to lift a sack of...
Questions
question
Mathematics, 01.12.2020 16:40
question
Mathematics, 01.12.2020 16:40
Questions on the website: 13722363