Asinglephase transformer has the following
nameplate data:
rating 150kva
primaryvoltage 7.2kv
secondaryvoltage 600v
frequency 60hz
whenoperating at rated load (full load) the
following lossesoccur:
hysterisisloss 550 w
eddy currentloss 400 w
total copperlosses 1800 w (primary + secondary)
thetransformer is to be used on a 50 hz system with
the restrictionthat it is to
maintain thesame maximum core flux density and the
same total losses. thiswill
result in thesame full load operating temperature.
determine:
(i) the newprimary and secondary voltage rating at
50 hz;
(ii) the newkva rating of the transformer of the 50
hz.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:20
Find the kinematic pressure of 160kpa. for air, r-287 j/ kg k. and hair al viscosity of air at a temperature of 50°c and an absolute (10 points) (b) find the dynamic viscosity of air at 110 °c. sutherland constant for air is 111k
Answers: 3
question
Engineering, 04.07.2019 18:20
For each of the following process: a) sketch the p-v diagram, b)sketch t-s diagram, c) sketch t-v diagram, d) sketch the boundary work on one of the diagrams (a, b or c) and e) sketch the reversible heat transfer on one of the diagrams (a, b or c): 1- isobaric process from compressed liquid to superheated vapor 2- isothermal process from compressed liquid to superheated vapor 3- isentropic process from compressed liquid to superheated vapor
Answers: 3
question
Engineering, 04.07.2019 19:10
Apressure vessel with an r/t 20 cannot be treated as thin walled vessel. a)-trune b)- false
Answers: 3
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
Asinglephase transformer has the following
nameplate data:
rating 150kva
primaryv...
Questions
question
Mathematics, 01.04.2020 16:08
Questions on the website: 13722360