subject
Mathematics, 27.04.2021 14:00 agilitygirl1

Construction company has four big front-end loaders located at four different workshops. The loaders must be moved to four different construction sites. The distances in kilometers are

tabulated below.

Loader A B C D Total distance

1 90 75 75 80 320

2 35 85 55 65 240

3 125 95 90 105 415

4 45 110 95 115 365

Total distance 295 365 315 365

Site

(a) How should the loaders be moved in order to minimize the total distance travelled? [6]

(b) Formulate the linear programming model for the data provided. [6]

(c) Formulate the dual model for the primal in (b). [6]

(d) Use the North-West Corner method to solve the problem. ​

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 15:50
(08.01)consider the following pair of equations: x + y = βˆ’2 y = 2x + 10 if the two equations are graphed, at what point do the lines representing the two equations intersect? (βˆ’4, 2) (4, 2) (βˆ’2, 4) (2, 4)
Answers: 2
question
Mathematics, 21.06.2019 19:00
You are at a restaurant and owe $38 for your meal. you want to leave a 20% tip. how much will your tip be?
Answers: 1
question
Mathematics, 22.06.2019 00:00
Which of the following is the maximum value of the equation y=-x^2+2x+5 a. 5 b. 6 c. 2. d. 1
Answers: 1
question
Mathematics, 22.06.2019 02:30
How many times larger is 9 Γ— 10^8 than 3 Γ— 10^-5? a. 3 Γ— 10^13 b. 3 Γ— 10^-40 c. 3 Γ— 10^-13 d. 3 Γ— 10^3
Answers: 2
You know the right answer?
Construction company has four big front-end loaders located at four different workshops. The loade...
Questions
question
Business, 29.01.2020 06:50
Questions on the website: 13722367